2024 West Region Conference – Cultural Crossroads in Education: Ruth Baleiko
7-5-2020 | News
The construction industry in Arizona continued to deliver high-quality projects during the first half of 2020 and it looks like that momentum will continue all the way through the year. AZRE Magazine asked Arizona Builders Alliance members to send in projects that have been recently completed or are currently under construction. Below are those projects, along with information about each one:
…
Developer: The University of Arizona
General Contractor: Sundt Construction
Architect: Miller Hull and Poster Mirto McDonald
Location: 1428 E University Blvd. Tucson
Size: 60,000 SF
Value: $57,714,476
Start/Completion: January 2019/January 2022
Subcontractors: Sundt Concrete, Hardrock Concrete, Blanco Concrete, JB Steel, Day’s Excavating, MKB, Wilson Electric, NW Exterminating, Kelley Brothers, Comfort Systems USA, RCD Demolition, Hiller & Sons Painting, Crown Custom Millwork, Kerr Masonry, Architectural Openings
Project description: The four-story Student Success building will be a centralized building for student services, mentoring, tutoring and career counseling. It is the only new construction on the project, with the remainder of the project including renovation to the Main Library, the Albert B. Weaver Science-Engineering Library and Bear Down Gym. The new district encourages students to move seamlessly between spaces that provide a full range of services and expertise, allowing them to reach their academic and career goals. The project is a design-build with Sundt’s design partners of Miller Hull and Poster Mirto McDonald. The multi-facility project is expected to be fully completed and open to students by 2022.
Originally built in 1962 as a small volunteer fire station, even with incremental additions over the…
5-5-2016 | News
The Georgia Institute of Technology has selected the team of Lord Aeck Sargent and The Miller…
3-15-2016 | News
The firm’s San Diego studio follows its Seattle studio in meeting this rigorous performance standard, making…
5-15-2020 | News
IDEA1, a six-story, residential-office-retail project nearing completion in East Village, may represent the ultimate in mixed-use development…
7-18-2017 | News
No longer silent, fusty and reserved for solitary study, libraries are now bright and buzzing spaces…
4-11-2016 | News
Innovative is a key descriptor for this highly sustainable building, the first timber structure built at…
3-2-2021 | News